2. Remove a forward decorative overlay of the dashboard (see subsection 13.26).
3. Give the control unit on yourself and disconnect conducting sockets.
4. Disconnect a temperature regulator cable from a rychazhka and get the control unit.
Installation
PERFORMANCE ORDER
Installation is carried out upside-down, at assembly transfer to the provision of the maximum thermolysis of a rychazhka of a temperature regulator and the mixing gate, attach a temperature regulator cable.