65637bd9


6.2.13.7. The thermostat of the raised idling turns


The thermostat is strengthened on the left side of the gate case.

Removal and installation

PERFORMANCE ORDER
1. Disconnect the battery from weight.
2. Remove the air filter.
3. Turn off a nut and get clamping a cam flange, a spring, laying and the lever, having paid attention to an arrangement of details.
4. Sort and get the valve, remove a sealing ring.
5. Installation is carried out upside-down.
6. Replace a sealing ring.