6.2.13.7. The thermostat of the raised idling turns
The thermostat is strengthened on the left side of the gate case.
Removal and installation
PERFORMANCE ORDER |
1. Disconnect the battery from weight. |
2. Remove the air filter. |
3. Turn off a nut and get clamping a cam flange, a spring, laying and the lever, having paid attention to an arrangement of details. |
4. Sort and get the valve, remove a sealing ring. |
5. Installation is carried out upside-down. |
6. Replace a sealing ring. |
|