1. Wipe dry demountable surfaces of a head and the block of cylinders. Be convinced available the directing pins on both parties of the plane of the block of cylinders and insert an oil nozzle into the center of the block. |
2. Put new laying on the block of cylinders, having combined openings in laying with pins and an oil nozzle. |
3. With the assistant carefully install a head on the block of cylinders, having combined a head from guides pins. |
4. Grease carvings and the lower parts of heads of bolts with pure oil. |
5. Dress on washer bolts so that the conic surface of washers was turned from a bolt head. |
6. Carefully insert bolts into the corresponding openings in a head (not to drop bolts), tighten them by hand. |
7. Tighten bolts 1–10 heads of cylinders in the specified sequence (see rice. Sequence of an inhaling of bolts of a head of cylinders) with the moment of the 1st stage of an inhaling. 11–15 with M6 carving do not tighten bolts yet. |
8. Tighten bolts with the moment of the 2nd stage. |
9. A minute later also release bolts in the sequence return specified rice. Sequence of an inhaling of bolts of a head of cylinders. Weaken an inhaling gradually, on 1/2 turns for reception until bolts do not begin to turn away by hand. |
10. Observing the sequence, tighten bolts with the moment of the 3rd stage of an inhaling. |
11. Tighten bolts on a corner of the 4th stage of an inhaling or tighten a dynamometer key with the moment of the 4th stage. |
12. Observing the sequence, tighten M6 bolts (bolts 11–15) with the set moment. |
13. Attach cooling system hoses. |
14. Execute the following operations:
– attach the being removed conductings, hoses and cables on the soaking-up collector; – attach a cable of a butterfly valve; – attach a reception pipe of the muffler, the socket of the sensor of the fulfilled gases (if it is provided); – install the air filter and an air duct. |
15. Establish cam-shafts (see subsection 3.1.1.10). |
16. Establish chains and asterisks. |
Prevention
If capital repairs of a head of cylinders are executed, then before installation of a cover of a head of cylinders check gaps in valves on the cold engine (see subsection 3.1.1.9).
|
17. Start the engine and warm up. Check gaps in valves on the heated-up engine (see subsection 3.1.1.9). |